HVAC Systems Testing, Adjusting and Balancing

HVAC Systems Testing, Adjusting and Balancing

HVAC Systems Testing, Adjusting & Balancing(TAB) of all HVAC systems in a new building is needed to complete the installation and to make the systems perform as the designer intended.Assuming that the system design and installation meets the comfort needs of the building occupants, good testing, adjusting and balancing of the HVAC system provides occupant comfort with minimum energy input. This is extremely important in this era of rising energy costs.

It is also important to make sure all factory equipment startup service has been completed before beginning any TAB work. Most specifications on new building construction usually require a factory representative to be present during the initial startup and adjustment of central boilers, chillers, large variable speed motor drives, and cooling towers. This initial equipment
checkout  also usually required to activate the factory warranties and are not be part of the TAB contractor’s responsibility. After this initial startup service has been completed, the TAB contractor should be informed that the systems are operating properly, that all safety interlocks and protective devices are functioning, and the systems are ready to be balanced.

You can also Read HVAC Air Duct Leakage Test Manual

HVAC Systems Testing, Adjusting & Balancing Content

  • Foreword HVAC Systems Testing, Adjusting and Balancing
  • Task force
  • Notice to users
  • Table of contents
  • Introduction
  • HVAC fundamentals
  • Electrical equipment and controls
  • Temperature control
  • Fans
  • Air distribution and devices
  • Air systems
  • Hydronic equipment
  • Hydronic systems
  • Refrigeration systems
  • Tab instruments
  • Preliminary tab procedures
  • General air system tab procedures
  • Tab procedures for specific air systems
  • Hydronic system tab procedures
  • Tab report forms
  • Appendix a duct design tables & charts
  • Glossary
  • Index

The Testing, Adjusting, and Balancing or TAB phase of any building construction or renovation intended to verify that all HVAC water and air flows and pressures meet the design intent and equipment manufacturer’s operating requirements.