Applying HVAC building services calculations Model Demonstration Project

Applying HVAC building services calculations Model Demonstration Project

Applying HVAC building services calculations Model Demonstration Project covers the complete project from inception to successful handover, either to the developer for later fit-out or to the end-user for occupation. This encompasses a number of stages and can vary with the type of project. There are many models of the building process, and it is outside the scope of this
project to review all of them.

Mechanical and electrical designers may be appointed, either to provide a full design and calculation service, or to produce a performance specification for development by an m&e contractor. This covered in more detail on page 3. In all cases there should be clear lines of accountability within the project team. In a building project this  traditionally determined by the architect. Project management is a core requirement to make sure that:

  1. completed building provides the functional requirements stipulated in the brief
  2.  cost budget  met
  3.  the programme is met
  4. quality levels  achieved
  5. the building can be safely maintained, operated and decommissioned.

You can also Read 2018 Uniform Plumbing Code

Applying HVAC building services calculations Model Demonstration Project

Introduction to the building processApplying HVAC building services calculations Model Demonstration Project
The demonstration project
Outline and detailed proposals stage
Final proposals/production information stage
A – Arrangement drawings for outline HVAC design
B – Outline design heat gain calculations
C – Outline design heat loss calculations
D – Outline design
E – Final proposals/production information
F – Condensation risk H4
G – Executive summary from engineering design

 

The selection and internal and external management of the project team (and the contractual conditions under which that management must operate) is vital to the success of a project. Specifically, the early appointment of the building services engineer can add real value to a project, particularly the orientation of the building on its site, the layout of the building and the space planning, and their effects on the operating efficiency and energy use of the building.

Download

Applying HVAC building services calculations Model Demonstration Project

2nd Link Here

 

Comments are closed.